Request to repair 8' x88' piling supported docking structure with no change in footprint on Lake Winnipesaukee
Chair D. Anson signed 6/11/21
Request to repair existing docking structure with no change in size, location or configuration\
Chair D. Anson singed 6/17/21
Repair existing permanent docking structures, supported on piles, three ice clusters with no change in size, location configuration or construction type. Replenish existing beach area which consists of 329 sf utilizing 6 cu yds of sand above full lake level elevation
Chair D. Anson signed 6/22/21
SFH impacting 650sf of forested wetland.
vice Chair D. Williams signed 7/2